FOR MORE INFORMATION CALL 869.469.8262
 

STANDARD FINISHES AND APPLIANCES
FLOORS
Italian ceramic tile by Tagina and Spacco di Cava.

KITCHEN

Cabinets
Italian cabinetry by Scavolini in the “Baltimora” or “Megan” styles.
Countertops
Granite countertops: Giallo Veneziano or equivalent.
Sink
Whitehaus stainless steel double sink with Rohl/Hansgrohe faucet and accessories
Appliances
GE Profile slide-in gas range, stainless steel finish
GE Profile side by side refrigerator with ice maker, stainless steel finish
GE Profile dishwasher, stainless steel finish
GE Profile microwave/ range vent in stainless steel finish

BATHROOMS

Bathroom Vanities, en suite baths
Custom cabinetry with countertops of Travertine
White porcelain sinks with Grohe faucets
Bathroom Vanity, powder room
White porcelain sink with Grohe faucet
Showers
Shower walls of Tagina ceramic tile
Semi-frameless 3/8” Diaman fusion glass shower enclosures with Grohe faucet
Toilets
Toto “Comfort Height” toilets

LAUNDRY

GE washer and dryer with shelving for linen storage
Note: Cliffdwellers may make substitutions of equal quality. Upgrades are available on request and need to be approved and priced prior to construction.



CONSTRUCTION MATERIALS

MASONRY
All concrete to achieve a minimum standard of 3,000 to 3,500 psi
Foundation to be reinforced 12” concrete and block and 5” slab on grade
Floors to be 6” reinforced concrete slab with tile or wood finish, as per plan
Walls to be 8” block, reinforced, with color impregnated plaster finish (exterior),and painted plaster finish (interior)

CARPENTRY
Rough carpentry of treated southern pine
Second Floor Ceilings (See plan): tongue and groove yellow pine v joint with painted finish
All door and window trim to be beaded and painted
Baseboard trim to be painted 6” poplar or equivalent.
Wood siding to be painted lapboard or wallaba shingles (over block walls), per plan

ROOF

Rafters laid in integral ring beam
Pre-finished, 24 gauge corrugated steel roofing over 15 pound roof felt
Insulation of ¾ inch urethane, foil on both sides
PVC gutters and downspouts
Flashings of .050 aluminum

Galvanized hurricane clips (double dipped where appropriate)

CEILINGS

Painted smooth plaster finish on first floor ceilings of two storey buildings.
Cathedral ceilings with tongue and groove boarding on second floor ceilings, and depending on design, on ceilings of first floor Great Rooms, Bedrooms, and Kitchens.

DOORS AND WINDOWS

Exterior Andiroba windows and doors by SMPM, St. Martin. Solid three panel interior room doors. Fixed louver closet doors.
Door and window treated wood hurricane shutters as per plan.
Door and window hardware in oiled bronze.

UTILITIES

200 amp individually metered electrical service with self-starting, propane emergency generator
Pre-wired for cable TV
Pre-wired for telephone service
Government water service with individual meter
Centralized sewer system
Pools and pool terraces
Construction of 6” reinforced block, finished in hydrazzo plaster, with glass tiled water line. Terrace to be 5” concrete slab finished in “Pool Cote” with tile inserts.


CLIFFDWELLERS LUXURY VILLAS AND SEASIDE RESIDENCES      PHONE 869.469.8262   FAX 869.469.8195